Report 00063

Published: 9 May 2014

Defects or Issues Identified

"No walkways next to some bays and unlashing/lashing cannot be done by us and the crew are forced to do this dangerous job with no walkway or handrail. This is at a number of bays."

Worksite

Patrick Terminal - Brisbane

Port Arrival

18/08/2013 22:00:00

Previous Issues

"DP world Brisbane have a report as well"

Actions Taken

  • Local MUA
  • Safety Report Lodged with company
  • Safety reps/MUA branch in onward port notified

Further Details

"I think the ship usually visits D P W and only comes to Brisbane. It should be fixed ASAP as most work is done in a dangerous way.



Home

Authorised by P Crumlin, Maritime Union of Australia, Sydney